ADWR Well Permitting Guide Yuma
You bought the dirt, but the State of Arizona controls the water beneath it. Ignorance of state groundwater law will result in massive fines and a capped borehole. We execute the heavy administrative lifting so you can legally secure your water supply.
Let Us Handle the DWR Paperwork
Direct terminal to legal filings. Complete cadastral surveying.
The Bureaucratic Reality of Arizona Groundwater
You purchase a raw five-acre parcel in the Fortuna Foothills, hire an excavator to clear the brush, and assume you are ready to drop a tricone bit into the earth. The State of Arizona disagrees entirely. In this state, groundwater is a fiercely protected, highly regulated physical asset. You do not have the right to blindly punch holes into the aquifer, regardless of what your deed says. The Arizona Department of Water Resources (ADWR) monitors and dictates every single foot of groundwater extracted within state lines.
Attempting to drill a water well without strict ADWR authorization is a direct violation of state law. If you hire a rogue driller to execute an unpermitted well, the state will find out. The financial penalties are staggering, and the ADWR will force you to physically destroy and cap the illegal borehole at your own expense. Before our heavy iron ever leaves the yard, the paperwork must be mathematically perfect. This guide strips away the bureaucratic confusion and outlines exactly what is required to drill a legal water system in Yuma County.
The ADWR Notice of Intent to Drill

The foundation of every legal well in the state is the ADWR Notice of Intent to Drill. You cannot call the state and verbally ask for permission. You must submit a rigid technical document detailing exactly what you intend to do to the subsurface geology. This document requires the signature of the landowner and the license information of the drilling contractor executing the work.
The state uses this Notice of Intent (NOI) to catalog the location of every active well, monitor the drawdown of regional aquifers, and ensure that new drilling operations do not illegally intersect with existing grandfathered water rights or protected municipal supplies. Once ADWR processes the NOI and issues an authorization card, the clock starts. We have exactly one year from the date of issuance to mobilize the rig, drill the hole, set the casing, and develop the well. If we fail to complete the project within that 365-day window, the permit dies, and the entire filing process starts over.
Navigating Form DWR 55-40 Yuma
The specific document required to trigger the NOI process is Form DWR 55-40. Filling out Form DWR 55-40 Yuma property owners quickly realize, is not like filling out a standard building permit. It demands strict cadastral and geographical precision. If you make a mathematical error on the location plotting, the state rejects the permit.
The form demands the exact legal description of your property down to a 10-acre cadastral subdivision. We do not just give them an address or cross streets. We must plot the well based on Township, Range, and Section, broken down further into quarter, quarter, quarter sections. We must also supply precise GPS coordinates (Latitude and Longitude in decimal degrees) for the exact spot the rig will be leveled.
Furthermore, Form DWR 55-40 demands the mechanical specifications of the proposed water system before it is even built. We must provide the state with the anticipated total borehole depth, the exact outer diameter of the proposed casing, the thickness of the casing material (e.g., SDR-17 PVC or 0.250-wall steel), and the proposed depth of the sanitary annular seal. As a Licensed & Insured contractor, we handle every piece of this technical plotting. We map your parcel, determine the cadastral requirements, and file the Form DWR 55-40 to guarantee state compliance.
The Legal Divide: Exempt vs Non-Exempt Well AZ
The most critical box you will check on the DWR 55-40 is the intended use of the water. This single designation dictates the legal future of your property. ADWR divides all groundwater extraction into two rigid categories: exempt and non-exempt.
The 35 GPM Rule: Exempt WellsDomestic ≤ 35 GPM
When you hear the term "exempt," it means the well is exempt from the heavy, ongoing bureaucratic reporting and water-use measuring required by commercial operations. To qualify as an exempt well in Arizona, the system must meet two absolute criteria:
- The well must be used exclusively for non-irrigation purposes, which legally translates to domestic, residential household use (including watering a non-commercial garden or small yard).
- The maximum pumping capacity of the installed submersible hardware cannot exceed 35 Gallons Per Minute (GPM).
Thirty-five GPM is an immense amount of water for a standard home in Yuma, AZ 85364. It is more than enough to run the house, the evaporative coolers, and standard landscaping. We engineer the physical pump and the drop wire specifically to ensure the system operates aggressively within this 35 GPM legal ceiling, protecting your exempt status.
Heavy Iron and Water Rights: Non-Exempt WellsCommercial > 35 GPM
If you are pushing 16-inch casing in Dome Valley to irrigate fifty acres of produce, or running cooling towers for a commercial facility in San Luis, you require a non-exempt well. A non-exempt well AZ state law dictates, is any well with a maximum pump capacity exceeding 35 GPM or any well used for commercial or agricultural irrigation.
Permitting a non-exempt well is an entirely different battle. In certain highly regulated zones, you cannot drill a non-exempt well unless you hold grandfathered groundwater rights, a Type 1 Non-Irrigation right, or a Type 2 right. Non-exempt wells must be outfitted with certified, state-approved flow meters. The property owner must track every gallon pulled from the aquifer and submit an Annual Water Withdrawal and Use Report directly to ADWR, accompanied by groundwater extraction fees. When we execute non-exempt drilling, we coordinate heavily with the state to ensure the large-diameter boreholes meet the exact spacing rules required to prevent interference with neighboring agricultural operations.
Yuma Specifics: The Colorado River Accounting Surface
Operating in Yuma County presents a unique geographical hurdle that drillers in the rest of the state do not face. Yuma sits directly adjacent to the Colorado River. The water in the river is governed by massive federal decrees and the U.S. Bureau of Reclamation, not just Arizona state law.
Because the alluvial soils in the Yuma Valley are highly permeable, the federal government established the "Colorado River Accounting Surface." If you drill a well in the river floodplain, and the static water level of your well sits at or below this invisible underground plane, the government presumes your well is actively pulling water directly from the Colorado River. Pumping river water without federal entitlement is strictly forbidden. We must carefully evaluate your parcel's location and ground elevation against the Accounting Surface maps to ensure your proposed well is classified as drawing state groundwater, rather than intercepting federal river flows. If you are in the friction zone, the permitting process requires meticulous technical maneuvering.
Post-Drilling Compliance: The Well Driller's Report

The ADWR Notice of Intent to Drill gives us permission to start. It does not mean the paperwork is finished. State law requires that the driller document exactly what happened beneath the dirt.
Once the mud settles and the well is air-lifted clean, we have 30 days to submit Form DWR 55-55, the Well Driller's Report and Well Log. This is a highly technical autopsy of the borehole. We must report the exact geological formations we encountered at every 10-foot interval (e.g., 0-20 ft Sand, 20-60 ft Caliche, 60-180 ft River Gravel). We must report the exact volume of grout used for the annular surface seal. We log the static water level, the exact footage of the factory-slotted screens, and the results of the mechanical yield test. This log becomes a permanent state record, permanently attached to your property deed.
Stop Fighting the State. Bring in the Professionals.
Bureaucracy does not pull water from the ground, but it will absolutely stop you from doing it yourself. You need a contractor who understands the legal mechanics of the state just as well as the fluid dynamics of a triplex mud pump.
Call Yuma Water Well Drilling at (928) 248-8305. We handle the DWR 55-40 paperwork for you. We plot the cadastral locations, define the exempt or non-exempt status of your project, and clear the legal path so our heavy rigs can get onto your property and get the hole drilled.
Cadastral legal plotting, Form DWR 55-40 submissions, and DWR 55-55 drill logging.
ADWR Permitting FAQs
What is the ADWR Notice of Intent to Drill?
The ADWR Notice of Intent to Drill (Form DWR 55-40) is a mandatory state permit required before a drill rig can legally break ground in Arizona. It establishes the well's cadastral location, intended use, and exact mechanical specifications.
What is the difference between an exempt vs non-exempt well in AZ?
An exempt well is legally restricted to a maximum pumping capacity of 35 gallons per minute (GPM) and is strictly for domestic household use, exempting it from heavy reporting. A non-exempt well pumps over 35 GPM for commercial or agricultural use and requires grandfathered water rights and strict metering.
Do I have to file Form DWR 55-40 Yuma paperwork myself?
No. As a Licensed & Insured drilling contractor, we handle the cadastral plotting, GPS surveying, and the complete filing of Form DWR 55-40 on your behalf to guarantee total legal compliance before our rigs arrive.
